June 2022 Project Photos
Pierre Abutment Stem Wall 6.30.2022
Pierre Abutment Stem Wall (2) 6.30.2022
Pierre Abutment Stem Wall (3) 6.30.2022
Pierre Abutment Stem Wall 6.29.2022
Aerial at Bent 4 Right 6.24.2022
Drilling at Bent 4 Right 6.23.2022
Aerial of Pierre Side Abutment 6.23.2022
Pierre Side Abutment 6.23.2022
Abutment Face Form Liners 6.23.2022
Abutment Face Form Liners (2) 6.23.2022
Abutment Face Form Liners (3) 6.23.2022
Abutment Face Form Liners (4) 6.23.2022
Aerial of Pierre Side Abutment (2) 6.23.2022
Aerial of Abutment Stem Wall 6.23.2022
Pierre Abutment Stem Wall 6.23.2022
Pierre Abutment Stem Wall (2) 6.23.2022
Pierre Abutment Stem Wall (3) 6.23.2022
Pierre Abutment Stem Wall (4) 6.23.2022
Aerial of Stem & South Wing Walls 6.22.2022
Aerial of Stem & South Wing Walls (2) 6.22.2022
Unloading Drilled Shaft Waste Material 6.21.2022
Unloading Drilled Shaft Waste Material (2) 6.21.2022
Unloading Drilled Shaft Waste Material (3) 6.21.2022
Drilling at Bent 4 Right 6.21.2022
Drilling at Bent 4 Right (2) 6.21.2022
Pierre Abutment Stem Wall 6.17.2022
Pierre Abutment Stem Wall (2) 6.17.2022
Pierre Abutment Stem Wall (3) 6.17.2022
Pierre Abutment Stem Wall 6.16.2022
Pierre Abutment Stem Wall (3) 6.16.2022
Pierre Abutment Stem Wall (2) 6.16.2022
Pierre Abutment Stem and Wing Walls 6.16.2022
Pierre Abutment Stem and Wing Walls (2) 6.16.2022
Work at Bent 7 6.16.2022
Work at Bent 7 (2) 6.16.2022
Work on Bent 7 Right 6.16.2022
Work on Steel Reinforcement Cage (2) 6.15.2022
Work on Steel Reinforcement Cage (3) 6.15.2022
Work on Steel Reinforcement Cage 6.15.2022
Forming Abutment Stem Wall (2) 6.14.2022
Forming Abutment Stem Wall 6.14.2022
Abutment Footing & Wing Walls 6.14.2022
Work on Wing Wall 6.14.2022
Concrete for Drilled Shaft at Bent 5 Left 6.10.2022
Concrete for Drilled Shaft at Bent 5 Left (2) 6.10.2022
Concrete for Drilled Shaft at Bent 5 Left (3) 6.10.2022
Concrete for Drilled Shaft at Bent 5 Left (4) 6.10.2022
Concrete for South Wing Wall 6.9.2022
Concrete for South Wing Wall (2) 6.9.2022
Concrete for South Wing Wall (3) 6.9.2022
Concrete for South Wing Wall (4) 6.9.2022
Concrete for South Wing Wall (5) 6.9.2022
Concrete for South Wing Wall (6) 6.9.2022
Work on South Wing Wall 6.8.2022
Work on South Wing Wall (2) 6.8.2022
Work on South Wing Wall (3) 6.8.2022
East Abutment & South Wing Wall 6.7.2022
Setting Forms for South Wing Wall 6.7.2022
Setting Forms for South Wing Wall (2) 6.7.2022
Setting Forms for South Wing Wall (3) 6.7.2022
Drilled Shaft Testing 6.7.2022
Drilled Shaft Testing (2) 6.7.2022
Drilled Shaft Testing (3) 6.7.2022
Work on East Abutment Footing (2) 6.3.2022
Work on East Abutment Footing 6.3.2022
East Abutment Footing & South Wing Wall (2) 6.3.2022
East Abutment Footing & South Wing Wall 6.3.2022
Digging East Abutment South Wing Wall 6.3.2022
Permanent Casing at Bent 5 Left 6.1.2022
Permanent Casing at Bent 5 Left (2) 6.1.2022
Permanent Casing at Bent 5 Left (3) 6.1.2022
Permanent Casing at Bent 5 Left (4) 6.1.2022
Reinforcing Steel (5) 6.1.2022
Reinforcing Steel (4) 6.1.2022
Reinforcing Steel (3) 6.1.2022
Reinforcing Steel (2) 6.1.2022
Reinforcing Steel 6.1.2022
Lowering Materials 6.1.2022
East Abutment Footing (2) 6.1.2022
East Abutment Footing 6.1.2022
Installing Side Forms (2) 6.1.2022
Installing Side Forms 6.1.2022
Measuring for Side Forms 6.1.2022
Work on East Abutment Footing 6.1.2022