2021 Project Videos

Capital Form Lowered onto 1st Column 8.19.21

Permanent Casing Lifted by Crane 5.25.21

Permanent Casing Lifted by Crane 2 5.25.21

Crane Placing Steel Cage 5.18.21

Rig Placing Holes for Aggregate Columns 5.14.21

Construction Site Aerial 4.21.21

Construction Site 4.8.21

Construction Site 4.2.21

Crane Mobilizing onto Barge 3.8.21

Barge Piling Dropped to Secure Barge to River Bottom 1.13.21

360 Aerial Airplane Footage 1.13.21

Fort Pierre Worksite 1.6.21