Pedestrian Traffic
Fort Pierre Side: The walkway on the Fort Pierre side under the bridge is closed due to construction. Please follow the construction detour signs for the pedestrian path and utilize the crosswalk at Yellowstone and US14/83 junction.
Pierre Side: The bike path/pedestrian walkway on the Pierre side under the bridge is open.
Through the remainder of the project, pedestrians should expect flagging on the existing path and short delays.