June 2022

Pierre Side Abutment 6.23.2022

June 2022 Project Photos Aerial at Bent 4 Right 6.24.2022 Drilling at Bent 4 Right 6.23.2022 Aerial of Pierre Side Abutment 6.23.2022 Pierre Side Abutment 6.23.2022 Abutment Face Form Liners 6.23.2022 Abutment Face Form Liners (2) 6.23.2022 Abutment Face Form Liners (3) 6.23.2022 Abutment Face Form Liners (4) 6.23.2022 Aerial of Pierre Side Abutment (2) […]

May 2022

Drilled Shaft at Bent 5 Right (2) 5.25.2022

May 2022 Project Photos Aerial of Concrete Placing (2) 5.25.2022 Aerial of Concrete Placing 5.25.2022 Concrete Testing 5.25.2022 Workers 5.25.2022 Concrete Placing 5.25.2022 Concrete Placing (2) 5.25.2022 Drilled Shaft at Bent 5 Right 5.25.2022 Drilled Shaft at Bent 5 Right (2) 5.25.2022 Cage for 5 Right Drilled Shaft (2) 5.24.2022 Cage for 5 Right Drilled […]

December 2021

Nighttime Drilling 2_12.7.21

December 2021 Project Photos Covered Concrete for New Column Capitol 12.20.21 Nighttime Drilling 2_12.7.21 Nighttime Drilling_12.7.21 Column Capitol_12.03.21 Reinforcement Steel_12.1.21 Drill Bit_12.1.21 Hyundai Excavator_12.1.21

November 2021

Bucket carrying concrete to Capital2_11.3.21

November 2021 Project Photos Beck 360 drill rig on barge_11.15.21 Cranes on site_11.15.21 Form pieces for Capitals_11.15.21 Kelly bars for drill_11.15.21 Loading material on barge_11.10.21 Drill rig and excavator base_11.10.21 Cranes on barges on the water_11.10.21 Crane moving kelly bar2_11.10.21 Crane moving kelly bar_11.10.21 Crane moving equipment3_11.10.21 Crane moving equipment2_11.10.21 Crane moving equipment_11.10.21 Beck Model […]

October 2021

Crews working on-site5_10.14.21

October 2021 Project Photos AGC Career Camp bridge tour_10.21.21 AGC Career Camp bridge tour_SDDOT engineer explaining drilled shaft process_10.21.21 AGC Career Camp bridge tour2_10.21.21 AGC Career Camp bridge tour3_10.21.21 AGC Career Camp surveying_10.21.21 AGC Career Camp surveying2_10.21.21 AGC Career Camp surveying3_10.21.21 AGC Career Camp surveying4_10.21.21 AGC Career Camp surveying5_10.21.21 AGC Career Camp surveying6_10.21.21 AGC Career […]

September 2021

Setting tie backs2_9.30.21

September 2021 Project Photos Setting tie backs_9.30.21 Setting tie backs2_9.30.21 Setting tie backs3_9.30.21 Attaching boom suspension pendants to gantry on crane_9.29.21 Attaching boom pendants to equalizer on crane _9.29.21 Attaching boom pendants to boom head_9.29.21 Excavator_9.29.21 Boom head on crane_9.29.21 Boom pendants attached to boom head _9.29.21 New barge being assembled_9.29.21 Pile hammer_9.29.21 American crane_9.22.21 […]

August 2021

Capital placed on column on for bent 2_8.19.21

August 2021 Project Photos Construction site on the water from Pierre_8.30.21 Temporary casing_ 8.30.21 Construction site on the water from Ft. Pierre_8.30.21 Crane carrying temporary casing_8.30.21 Crane and temporary casing_8.30.21 Ft. Pierre dirt removal by bridge_8.30.21 Setting temporary casing_8.30.21 Setting temporary casing2_8.30.21 Setting temporary casing3_8.30.21 Setting temporary casing4_8.30.21 Crane and pile hammer_8.23.21 Hammering temp shoring_8.23.21 […]

July 2021

Prepping for concrete pour for drilled shaft column_7.8.21

July 2021 Project Photos Pile hammer and the leads_7.27.21 Pile hammer and the leads 2_7.27.21 DOTNet field trip_7.27.21 DOTNet field trip2_7.27.21 Excavator_7.27.21 Forklift moving equipment_7.27.21 Large drill auger_7.27.21 Material staging area on Fort Pierre side_7.27.21 Metal frame for capital column_7.27.21 Miscellaneous sized drill augers_7.2721 Reinforced steel cages for bridge colums_7.27.21 Telehandler forklift_7.27.21 Crane lifting sheet […]

June 2021

Lifting temporary casing for 2nd drilled shaft2_6.9.21

June 2021 Project Photos Attaching flexible hose from concrete pump to port on tremie tube_6.30.21 Attaching flexible hose from concrete pump to port on tremie tube2_6.30.21 Concrete pour for 2nd drilled shaft_6.30.21 Concrete pour for 2nd drilled shaft2_6.30.21 Monitoring tremie hopper attached to concrete pump_6.30.21 Pouring concrete into chute_6.30.21 Drilling at sunrise_6.29.21 Drill and boat_6.29.21 […]

May 2021

Drill shaft receding from casing3_5.5.21

May 2021 Project Photos Drill rig equipment_5.28.21 Hoist and pile driver_5.28.21 Load and hauling excavated materials_5.28.21 Pile driver driving crushed rock for aggregate columns_5.28.21 Pile driver for aggregate columns_5.28.21 ft_5.28.21 Rig and bucket loader_5.28.21 Construction site_5.28.21 Assembling steel cage_5.25.21 Reinforced steel cage_5.25.21 Permanent casing and vibratory hammer_5.25.21 Pile driver and Rig_5.28.21 Permanent casing set in […]