August 2021 Project Photos
Construction site on the water from Pierre_8.30.21
Temporary casing_ 8.30.21
Construction site on the water from Ft. Pierre_8.30.21
Crane carrying temporary casing_8.30.21
Crane and temporary casing_8.30.21
Ft. Pierre dirt removal by bridge_8.30.21
Setting temporary casing_8.30.21
Setting temporary casing2_8.30.21
Setting temporary casing3_8.30.21
Setting temporary casing4_8.30.21
Crane and pile hammer_8.23.21
Hammering temp shoring_8.23.21
Permanent casing for bent 3_8.23.21
Reinforced steel cage for bent 3_8.23.21
Temporary casing for bent 3_8.23.21
Top of boom of the drilling crane on barge_8.23.21
Top of crane on with Capital in distance_8.23.21
Capital placed on column on for bent 2_8.19.21
Setting temp shoring_8.19.21
Setting temp shoring2_8.19.21
Welding the drill_8.10.21
Setting temporary shoring pierre side_8.10.21
Pierre bridge inspection Aug 10 2021
Kelly bar and crane_8.10.21
Pile hammer_8.5.21
Fort Pierre construction site2_8.5.21
Fort Pierre construction site_8.5.21
Checking location
Completed reinforced steel cage_8.3.21
Crane in Fort Pierre_8.3.21
Crane lifting vibratory hammer_8.3.21
Crane lifting vibratory hammer2_8.3.21
Crane lifting vibratory hammer3_8.3.21
Crane with drill shaft and auger_8.3.21
Cranes on the river_8.3.21
Crews working on the Pierre side_8.3.21
Diesel pile hammer installing temporary shoring_8.3.21
Diesel pile hammer installing temporary shoring2_8.3.21
Excavation work on Fort Pierre side_8.3.21
Excavation work on Pierre side_8.3.21
Expansion disc bearsings_8.3.21
Installing temporary shoring_8.3.21
Installing temporary shoring2_8.3.21
Temporary casing_8.3.21
Share this: