June 2021 Project Photos
Attaching flexible hose from concrete pump to port on tremie tube_6.30.21
Attaching flexible hose from concrete pump to port on tremie tube2_6.30.21
Concrete pour for 2nd drilled shaft_6.30.21
Concrete pour for 2nd drilled shaft2_6.30.21
Monitoring tremie hopper attached to concrete pump_6.30.21
Pouring concrete into chute_6.30.21
Drilling at sunrise_6.29.21
Drill and boat_6.29.21
Drill and boat2_6.29.21
Depth of drilling_6.29.21
Backhoe used for cleaning the sludge off the barge_6.29.21
Cleaning off the drill_6.29.21
Setting drill bit in place for removal_6.29.21
Removing the old drill bit2_6.29.21
Attaching new drill bit_6.29.21
Attaching new drill bit2_6.29.21
new drill bit heading down_6.29.21
Filling the hopper with aggregate_6.29.21
Pile driver, rig, and bucket loader_6.29.21
Cleaning the drill bit by hand_6.29.21
Sludge pile from drilling_6.29.21
Rig and pile driver on Pierre side_6.27.21
Crane assembled on Pierre side_6.27.21
Crane drilling_6.27.21
Different size drill augers_6.27.21
Drill auger_6.27.21
Drill auger_6.27.21 (2)
Drill shaft_6.27.21
Drilling drilled shaft_6.27.21
Drilling drilled shaft2_6.27.21
Drilling taking place_6.27.21
Fort Pierre Construction site_6.27.21
Fort Pierre excavated and leveled for approach work_6.27.21
Construction site_6.22.21
Construction site2_6.22.21
Crane loaded for transport_6.22.21
Crane being transported to Pierre_6.22.21
Crane on Pierre side_6.22.21
Lift driving to Pierre side_6.22.21
Equipment moving to Fort Pierre2_6.22.21
Equipment moving to Fort Pierre_6.22.21
Backhoe_6.11.21
Construction equipment2_6.11.21
Construction site_6.11.21
Cranes_6.11.21
Temporary casing_6.11.21
Dumping crushed rock into hopper for aggregate columns_6.9.21
Dumping crushed rock into hopper for aggregate columns2_6.9.21
Dumping crushed rock into hopper for aggregate columns3_6.9.21
Dumping crushed rock into hopper for aggregate columns4_6.9.21
Dumping crushed rock into hopper for aggregate columns5_6.9.21
Rig, pile driver and bucket loader_6.8.21
Lifting temporary casing for 2nd drilled shaft_6.9.21
Lifting temporary casing for 2nd drilled shaft2_6.9.21
Lifting temporary casing for 2nd drilled shaft3_6.9.21
Lifting temporary casing for 2nd drilled shaft4_6.9.21
Lifting temporary casing for 2nd drilled shaft5_6.9.21
Tugboat pushing barge1_6.9.21
Tugboat pushing barge2_6.9.21
Tugboat pushing barge3_6.9.21
Tugboat_6.9.21
Site from Pierre side_6.3.21
Removing the old drill bit_6.29.21
Drill head_6.3.21
Crane and drill head_6.3.21
Permanent casing for 2nd drilled shaft_6.1.21
construction site_6.1.21
Completed shaft and permanent casing for 2nd drilled shaft2_6.1.21