Project Updates
Road Traffic
Pedestrian Traffic
River Traffic
News
Photos
Videos
Did You Know
Stats
History
Contact
Menu
Project Updates
Road Traffic
Pedestrian Traffic
River Traffic
News
Photos
Videos
Did You Know
Stats
History
Contact
May 2021 Project Photos
Drill rig equipment_5.28.21
Hoist and pile driver_5.28.21
Load and hauling excavated materials_5.28.21
Pile driver driving crushed rock for aggregate columns_5.28.21
Pile driver for aggregate columns_5.28.21
ft_5.28.21
Rig and bucket loader_5.28.21
Construction site_5.28.21
Assembling steel cage_5.25.21
Reinforced steel cage_5.25.21
Permanent casing and vibratory hammer_5.25.21
Pile driver and Rig_5.28.21
Permanent casing set in river_5.25.21
Permanent Casing2_5.25.21
Permanent Casing_5.25.21
Casing being lifted by crane_5.25.21
Permanent Casing being lifted by crane6_5.25.21
Permanent Casing being lifted by crane5_5.25.21
Permanent Casing being lifted by crane4_5.25.21
Permanent Casing being lifted by crane3_5.25.21
Permanent Casing being lifted by crane2_5.25.21
Permanent Casing being lifted by crane_5.25.21
Construction site on the water_5.25.21
Temp casing to be installed_5.25.21
2nd Reinforced the steel cage_5.25.21
Crews cleaning up barges from first drilled shaft pour_5.21.21
First drilled shaft complete and drying_5.21.21
Spoil pile_5.21.21
PLS night time pouring_5.18.21
Night time crane bridge_5.18.21
Night time concrete pour2_5.18.21
Night time concrete pour_5.18.21
Long evening of concrete placement in drill shaft_5.18.21
Watching concrete pour_5.18.21
Spotlight for night work_5.18.21
Concrete being tested2_5.18.21
Concrete being tested_5.18.21
Concrete in hopper_5.18.21
Concrete dumped into chute_5.18.21
Concrete dumped down chute and into hopper_5.18.21
Concrete pours3_5.18.21
Concrete pours2_5.18.21
Concrete pours_5.18.21
Concrete pumped into Tremie_5.18.21
Construction crew2_5.18.21
Construction crew_5.18.21
Construction site_5.18.21
Crane and bridge_5.18.21
Trailer concrete pump_5.18.21
PLS concrete pour_5.18.21
PLS truck
Cage being positioned in casing_5.18.21
Reinforced Steel Cage3_5.18.21
Reinforced Steel Cage_5.18.21
Reinforced Steel Cage2_5.18.21
Crane1_5.13.21
Crane2 working_5.13.21
Crane4 being assembled_5.13.21
Drill bit teeth_5.13.21
Drill bit_5.13.21
Drill bit2_5.13.21
Drill head_5.13.21
Drill Rig & Bridge_5.13.21
Drill rig for aggregate columns_5.13.21
Drilling holes for footings_5.13.21
Excavated material_5.13.21
Excavation barge_5.13.21
Fort Pierre excavation_5.13.21
Gravel being dumped_5.13.21
Hoist and bucket_5.13.21
Pierre side excavation_5.13.21
Pile driver for aggregate columns_5.13.21
Reinforced steel cage_5.13.21
Temporary Casing_5.13.21
Vibratory hammer and hopper_5.13.21
Crane and tugboat_5.3.21
Spoil material being offloaded_5.5.21
Cranes and equipment_5.3.21
Hopper for gravel_5.13.21
Drilling before sunrise_5.5.21
Drill shaft with 55 ft label_5.5.21
Drill shaft with 55 ft label2_5.5.21
Drill shaft receding from casing_5.5.21
Drill shaft receding from casing2_5.5.21
Drill shaft receding from casing3_5.5.21
Concrete pump_5.3.21
DOT crew on site_5.3.21
Drill head is ready_5.3.21
Fourth crane being built_5.3.21
Reinforcing steel cage_5.3.21
Retaining wall on Fort Pierre side_5.3.21
Temporary and permanent casings_5.3.21
Temporary casing_5.3.21
Tremie pipe_5.3.21
Worker walking past temp casing_5.3.21
Share this:
Tweet
Leave a Reply
Cancel reply
Loading Comments...
Write a Comment...
Email (Required)
Name (Required)
Website