Project Updates
Road Traffic
Pedestrian Traffic
River Traffic
News
Photos
Videos
Did You Know
Stats
History
Contact
Menu
Project Updates
Road Traffic
Pedestrian Traffic
River Traffic
News
Photos
Videos
Did You Know
Stats
History
Contact
April 2021 Project Photos
Tugboat moving barge_4.29.21
Crane doing pre-drill work2_4.29.21
Crane moving materials onto barge_4.29.21
Excavator removing pre-drill riverbed_4.29.21
Material removed from riverbed_4.29.21
Permanent casing_4.29.21
Pierre side abutment_4.29.21
Pierre side excavation_4.29.21
Reinforced steel cage_4.29.21
Site equipment_4.29.21
Crane doing pre-drill work_4.29.21
Crane 4 being assembled_4.29.21
Concrete dump boxes_4.29.21
Balance weight for crane 4_4.29.21
Aerial of casing installation_4.28.21
Aerial of casing installation2_4.28.21
Crane lifting permanent casing3_4.26.21
Crane lifting permanent casing2_4.26.21
Crane lifting permanent casing_4.26.21
Work on temporary shoring_4.20.21
Tugboat_4.20.21
KELO interviewing DOT staff2_4.20.21
KELO interviewing DOT staff_4.20.21
Drill augers_4.20.21
Crane on construction site_4.20.21
Crane on barge_4.20.21
Hydraulic Pack_Vibratory Hammer_4.5.21
Clean out tools, auger heads, drill bits_4.5.21
Bridge Footing Marking_earthwork is set to begin
DOT truck_4.8.21
Crane moving piling 4.8.21
Drill shaft_4.8.21
Earthwork 4.8.21
Overhead earthwork 4.8.21
Pilings ready to be lifted_4.8.21
Overhead shot of vibratory head and pilings
Sheet pilings and crane_4.8.21
Sheet pilings_4.8.21
Sheet pilings2_4.8.21
Vibratory hammer_4.8.21
Temporary shoring 4.8.21
Vibratory head and pilings 4.8.21
Vibratory Head 4.8.21
Kelly Bar installed in drill head_4.9.21
Kelly Bar installed in drill head2_4.9.21
Hydraulic Pack_4.5.21
Construction site_4.5.21
Crane 3_4.5.21
Drill head2_4.5.21
Drill head4_4.5.21
Drill head3_4.5.21
Drill head, size of a dozer without tracks_4.5.21
Share this:
Tweet
Leave a Reply
Cancel reply
Loading Comments...
Write a Comment...
Email (Required)
Name (Required)
Website